Saturday 30/Aug/2025 – 04:41 PM
Major General Khaled Mubarak, the governor of South Sinai, responded to the distress of Wadi Zughair in Nuweiba, and the Wadi Zughair well was operated after a six -year hiatus.
The inhabitants of Wadi Zughair were joy in Nuweiba, after the main groundwater well returned to work, after stopping service for six years.
The reform process came in response to the directives of Dr. Khaled Mubarak, the governor of South Sinai, who stressed the need to restart the well again.
The Nuweiba City Council assumed responsibility for providing the necessary spare parts, and the recruitment of a raised winch from North Sinai.
The reform process was supervised by Major General Abdel Rahman Mohamed Bahaa El -Din, President of Nuweiba, and was attended by officials from the groundwater sector and the South Sinai Water Company, in addition to the accompanying technical staff.
The maintenance work has ended successfully, and the water returned to heavily, which threw the breasts of the valley.
The Bedouin sheikhs in Nuweiba expressed their thanks and gratitude to everyone who contributed to the completion of this vital work, and it is scheduled to prepare a regulation to organize the water distribution process, to ensure that it reaches all the beneficiaries.



