Saturday 24/2025 – 12:52 PM
Engineer Adel Al -Najjar, Governor of Giza, confirmed the completion of paving a number of vital roads at the Marine Oasis Center, in cooperation with the New Valley Reconstruction Authority, the marine oases area, in the context of the development efforts made by the governorate to advance the infrastructure and develop the road network.
The governor said in a statement, that the works included the completion of the paving of the Bamb road with a length of about 1,200 meters, through the Middle Road Road in addition to paving the Ahmed Eid road that connects the main ring road to the Egypt -Al -Wahat Road in the south, with a length of about 1 km, as well as the completion of the paving of the Bir al -Dawlab road in the village of the palace with a length of 1 km.
He added that the road planning work has been completed, and the installation of guidance signs, with the aim of facilitating traffic and enhancing safety factors on these vital axes.
A comprehensive plan to develop and raise the efficiency of the road network in oases
The governor pointed out that the total cost of these works amounted to about 11.5 million pounds, as part of a comprehensive plan to develop and raise the efficiency of the road network in the oases.
He emphasized that the dual paving of the Middle East paving, within the framework of the governorate’s plan to create new traffic axes, reduce traffic densities inside the city and link the axes together in a way that contributes to improving the movement of transport and transporting citizens.


