Tuesday 19/Aug/2025 – 07:35 PM
The team, Ahmed Khaled Hassan Saeed, the Governor of Alexandria, continued this morning, the report received regarding an electrical malfunction inside the castle of the castle at the firstpical entrance to the East neighborhood, which is affiliated with the Ministry of Irrigation.
An electrical malfunction causes a disbursement station to work
The electrical holidays caused the drainage station to stop working, which led to a noticeable rise in the water level in the Citadel Bank, the Zahra Bank, and the Airport Dira District for the transportation of the eastern purification station drainage.
Immediately after receiving the communication, the Governor of Alexandria directed to raise the maximum level of preparation among all the competent authorities, and to be the immediate presence of the holidays site to take the necessary urgent measures.
The Electricity Company, which reported that there was a malfunction in the internal distributor inside the station, and immediately, was paid with 2 diesel units to operate the station temporarily until the completion of the repair and the electricity is normal.
The drinking water company also directed 6 with aid to help lift water, and the sewage company has paid water to displace water.
The repair works, the electrical current to the station, and the re -work, have been completed at full capacity.
The governor also continued to raise the state of alert until the situation stabilizes completely, stressing the need to conduct a comprehensive review of the infrastructure of vital stations, and to determine the priorities of maintenance to avoid the repetition of such breakdowns in the future.