Tuesday 24/June/2025 – 12:45 PM
Engineer Adel Al -Najjar, Governor of Giza, confirmed the completion of the repair work with a water pipe at the intersection of the League of Arab States Street with Suleiman Abaza Street in the Dokki neighborhood.
The governor indicated that the position was immediately dealt with by the drinking water and sanitation company and the Dokki neighborhood to contain the repercussions of the fracture and to ensure that traffic or services provided to citizens are not affected.
Giza Governor: The completion of repairing a water pipe break on the Arab League Street with Suleiman Abaza Street in Al -Dokki neighborhood
He pointed out that the water was naturally pumped to the affected real estate, in addition to the suction of the water resulting from the fracture and the removal of the waste resulting from the work, which contributed to the management of traffic without any obstacles.
Al -Najjar explained that the governorate is pursuing regularly the regularity of the work of vital facilities around the clock and dealing immediately with any reports to maintain the efficiency of networks and ensure the continuity of providing services.
The reform work has witnessed a field follow -up from Eng. Mohamed Rizk, head of the Dokki neighborhood from the report until four in the morning, accompanied by the competent emergency teams, where the full reform and the restoration of its origin have been completed.